North America’s Construction Economist

Middlebury College Master Plan

Get In Touch With Us

Enter your information below and we will get in touch with you!

Middlebury College Master Plan

The plan was built on a foundation of sustainability principles, which will guide the College's growth and development for the next 50 years. The plan contains many recommendations that support the College's goal of achieving carbon neutrality by 2016, ranging from dramatically increasing renewable energy for heating and cooling to making the Campus more bike-friendly.

The master plan sets forth 10 overall goals:

(1) Promoting sustainability in all college operation and planning.
(2) Enhancing Middlebury’s relationship to the ecological landscape.
(3) Reinforcing the campus’s architectural character and scale.
(4) Promoting an accessible, pedestrian-friendly campus.
(5) Improving the relationship between town and college.
(6) Increasing the variety of campus open spaces.
(7) Optimizing pedestrian and vehicle traffic flow.
(8) Fostering year-round campus.
(9) Consolidating academic units on campus.
(10) Establishing connectivity between campus areas.

Our scope of work included cost estimates for 4,730,000sf of landscape, 970,000sf of buildings and infrastructure. In total, 29 buildings, infrastructure, and landscaping related to 19 spaces were budgeted. In addition to our database of peer institutions, recent bids we used for the school, analysis of estimate, conversations with facilities management, and analysis of consultant’s reports.

Reference
Michael Dennis & Associates
Michael Dennis
617 338 8713

VERMEULENS UPDATES

What update would you like?

Quarterly Market Reports
Green At No Cost
Industry News

 

Architectural Resources Cambridge

"I understand that all of your MEP staff are either mechanical or electrical engineers and are therefore able to project what has not yet been drawn. In my opinion, this is one of the most valuable things you bring to the table."

- Architectural Resources Cambridge

Architerra

"Consistently, we find that Vermeulens® has more enthusiasm and expertise than any other cost estimator with whom we've worked."

- Architerra

McGill University Health Centre

"Your involvement with the MUHC Project has created new standards in construction estimating in the Quebec Health Care System."

- McGill University Health Centre

Partners (Healthcare)

"Your team's ability to address cost issues as they related to the ever-changing technology of healthcare is impressive."

- Partners (Healthcare)

Payette

"We enjoy pushing the envelope of design with you at our side to enable the team to deliver within a realistic budget."

- Payette

Perkins + Will

"Vermeulens has been very supportive of the client's vision from the very inception of the work."

- Perkins + Will

The University of Chicago

"The accuracy of your estimate on our $200 million dollar (job) gave the University the confidence to test our project in the construction market. This strategy resulted in the University saving more than $10 million from the estimates provided by others. This is quite a return on the investment we made in your fee."

- The University of Chicago

Truex Cullins & Partners Architects

"Every bid project we've worked on with Vermeulens Cost Consultants, during the past twenty plus years, has come in within the prepared and accepted budget range."

- Truex Cullins & Partners Architects

UOIT

"We need accurate estimates to manage an aggressive construction schedule with limited resources of time and money. I can safely state that our needs were met by Vermeulens®"

- UOIT

Virginia Performing Arts Foundation

"As we wrestled with the scope changes, value engineering, schedule issues, and funding questions you have never strayed from helping us to keep our eye on the bottom line."

- Virginia Performing Arts Foundation

Walsh Brothers

"Our collaborations are marked by openness, a mutual respect of differing opinions, and a willingness to assimilate a complete picture based on the information regardless of the source."

- Walsh Brothers

Latest News:
Vermeulens V
 
Boston Toronto San Antonio Denver Los Angeles
Head office: 9835 Leslie Street, Toronto, ON L4B 3Y4 905 787 1880
Copyright © Vermeulens®